采矿英语专业词汇
A. 急求采矿专业英语翻译
6.1
Rock
Mass
Classification
6.1岩石分级
1.Introction介绍
During
the
feasibility
and
preliminary
design
stages
of
a
project,
when
very
little
detailed
information
is
available
on
the
rock
mass
and
its
stress
and
hydrologic
characteristics
,the
use
of
a
rock
mass
classification
scheme
can
be
of
considerable
benefit.
在一个项目的可行性和初级设计阶段,当获得有关内岩体和水文特性的资料非常容少的时候,那么一本岩石分级方案是相当大的益处.
B. 用采矿专业英语翻译
煤炭是我国国民经济的基础产业,然而,我国的煤炭资源在开发利用过程中却存在着不少问题
Coal is basic instry of our national economy, however, there are many problems in the process of exploitation and utilization.
为了能源的可持续供给,只有中国煤炭工业可持续发展,才能满足煤炭的可持续供给, 这是中国的现实和未来
In order to supply energy continuously, The only way is sustainable development of China coal instry to satisfy sustainable supply, which is reality and future of China.
调整产业结构,加快产业转型,内增企业活力,外增吸纳生产要素的活力,加快走新型化工业道路,走多元化道路,培育发展多个支柱产业,才能使煤炭企业走上全面、协调、可持续发展的道路
To adjust the instrial structure, and speed up the instry transition, increase the enterprise's vitality inside and absorb vitality of proction factor from the abroad, accelerate going new type of instrial road and diverse road, and cultivate some pillar instries, so It is possible to go the road that is comprehensive, balanced and sustainable development for the coal enterprises.
若有所帮助,请采纳,若需完善,请hi我.
C. 采矿专业英语翻译(在线等,急)
The design for the underground mining design, design task is to flag the sheep-city tower Bao coal mine, the mine located in the Ordos City, Inner Mongolia Autonomous Region Zhungeer flag, administrative division under the flag of the sheep Zhungeer the town of Tower City.
Mine with an annual output of 450,000 tons proction scale exploitation of length of service was 36.9 years, designed with Adit pioneering system, multi-level mining, tape machine transport as the main mode of transport, mining methods adopted by the long arm of a single integrated mechanized mining methods, out - Ventilation and the ventilation fan combination of ventilation systems, multi-stage pump water drainage system Yang, design completed a total of eight drawings, design specification 79.
Key words; development, mining methods, the ventilation system
D. 采矿用英语怎么说
您好!
很高兴为你翻译、解释。您提出的采矿用英语怎么说?
只有专业说内法:mining(汉字注音:埋岭)容最准确。(汉语含义:n.采矿, 矿业)可做动名词。
英语的其他表达方式均不能准确地表达“采矿”的动名词。
例如:mine pron.我的;n.矿, 矿山, 矿井, 源泉, 宝库, 地雷, 水雷;vt.挖掘, 开采, 在...布雷, 破坏
vi.开矿, 埋设地雷等,只适合做“开矿”的动词
希望我的翻译、解释对你有帮助,祝你心想事成!
E. 采矿专业英语翻译
Abstract: Sham Tseng goaf water may accumulate and be difficult to detect in time is the exploitation of the process led to the flooding problems. In this paper, micro-rock mining in the breakdown of elastic waves generated by the information source, application of rock mass elastic wave and the related breakdown of the theory and technology, to explore unknown goaf water accumulation and nucleation process, found the exact elastic wave velocity than the VP / VS, the amplitude ratio VSH / VPH, spectral, waveform, and frequency of abnormal microseism. Application of this proposed microseism ground telemetry, on-line monitoring and prediction of mine water hazards unknown technical ideas.
Keywords: coal; process water; microseism technology; forecast warning
F. 采矿专业英文翻译
The Ge Ting coal mine is that Zi Bo City Bureau of Mines develops the third pair of the northwest part modernizing a shaft , being located in Shandong Province Ji Ning City building in helping north mining area. The shaft year designs 600,000 tons of efficiency , design the length of service 51. The shaft may cut coal being 3 coal , 16 coal , 17 coal tier mainly , the host mines 3 coal seams. The village , highway pressure coal are grave and , 3 coal seam length of service shortens since shaft geology condition is complicated,be prolong the shaft length of service, decide to exploit 16 , 17 coal, coal matches spirit with 3. And design that condition considers the queen synthetically , put forward opens up a scheme by the geology general situation , well-field range , reserves and 16 , 17 coal seam geology to well-field originally , push and big alleys by the fact that the economy technology ascertains the tie making use of 130 orbits to go up the hill preparing adhesive tape going up the hill comparatively going up the hill exploiting, the mining area being in progress to 1160 mining area designs that. By the analysis to 1160 mining area geology condition, the for sure adopt long unitary make for wall coal mining law , single wing exploits, coal mining handicraft has adopt top grade Pucai , has adopt all caving law to manage a roof, driving face adopt a cannon dig. And carry out equipment choosing a type , arrange turn out system after ascertaining the mining area parameter, work out safe technology measure. Keywords: Well-field opens up , mining area , make for increase wall coal mining law , top grade Pucai
G. 采矿专业英语翻译 急需
其中最关键的步骤以任何极限平衡分析测定或估算抗剪强度参数(c、φ)的表面及预期滑动。在这个斜坡上寿茅坪道路,没有抗剪强度是可用的信息的时候,所以估计,初步研究了由出版信息的基础上对类似的岩石。
该书收获(1974年)出版,情节、复制图7.8,粘性的优点和摩擦角的岩石和土壤,基于估计结果的公布的抗剪强度反演斜坡破坏。这个故事是在一个椭圆区
涵盖范围估计为单节理的剪切强度unweathered花岗石。在选择这一范围认为摩擦角φ大概的范围很广,从30°平面表面非常光滑,45度粗糙或半硬质合金表面。
更多的粘结强度是很难估计,0.05
被选中的0.2兆帕的结果为依据,对边坡back-analyses绘制如图7.8级
图7.8:摩擦角之间的关系、粘聚力斜坡破坏动员各种材料。在绘制分被出版信息的反馈分析边坡的失败。1974年,跟收获后)。
有些读者可能会很惊讶这一粘结强度已假定为关节表面,明显地没有拉伸强度或' ',就会发现粘性土中。事实上,这种假设粘结强度是被截获、剪切力轴,一个切线方向的曲线莫尔信封。这是由于曲率的匹配的齿形相连的关节面
增加的剪切强度由该联锁起着至关重要的作用,在100米第七章:一个边坡稳定问题在香港的稳定边坡的。例如,在考虑在这一章。一个充分的讨论的剪切强度的岩层面在第4章。
H. 采矿工程专业英语翻译
对于继续采矿来说,一次性打入两处是有效率的。通常在采矿中,每个机器打版入至权少一次需要5次操作。最理想最高效的是将打入总次数控制在7-10次。因为在确保安全的前提下,不考虑产品,16处平行打入,能够提供足够的通风以及搬运容量。因此最少5个主要入口常应用于将开放式矿井开采为裸矿,如数据8.2所示,
I. 有关矿产类的英语 单词 有谁整理的共享一下 急用 谢谢!
矿产mineral
金矿gold
银矿silver
铜矿coop
锡矿stannary['stænəri]
铁矿iron
煤矿coal mine
以上是一些常用的矿产
接下来是一些与开采矿有回关的单词
矿车,矿层(答ore car/ore car)
矿工-miner
采矿和冶金业-mining and metallurgy
矿山-mine
差不多就是这些,太难的也用不到