當前位置:首頁 » 專業翻譯 » 采礦英語專業詞彙

采礦英語專業詞彙

發布時間: 2021-03-05 16:26:34

A. 急求采礦專業英語翻譯

6.1
Rock
Mass
Classification
6.1岩石分級
1.Introction介紹
During
the
feasibility
and
preliminary
design
stages
of
a
project,
when
very
little
detailed
information
is
available
on
the
rock
mass
and
its
stress
and
hydrologic
characteristics
,the
use
of
a
rock
mass
classification
scheme
can
be
of
considerable
benefit.
在一個項目的可行性和初級設計階段,當獲得有關內岩體和水文特性的資料非常容少的時候,那麼一本岩石分級方案是相當大的益處.

B. 用采礦專業英語翻譯

煤炭是我國國民經濟的基礎產業,然而,我國的煤炭資源在開發利用過程中卻存在著不少問題
Coal is basic instry of our national economy, however, there are many problems in the process of exploitation and utilization.

為了能源的可持續供給,只有中國煤炭工業可持續發展,才能滿足煤炭的可持續供給, 這是中國的現實和未來
In order to supply energy continuously, The only way is sustainable development of China coal instry to satisfy sustainable supply, which is reality and future of China.

調整產業結構,加快產業轉型,內增企業活力,外增吸納生產要素的活力,加快走新型化工業道路,走多元化道路,培育發展多個支柱產業,才能使煤炭企業走上全面、協調、可持續發展的道路
To adjust the instrial structure, and speed up the instry transition, increase the enterprise's vitality inside and absorb vitality of proction factor from the abroad, accelerate going new type of instrial road and diverse road, and cultivate some pillar instries, so It is possible to go the road that is comprehensive, balanced and sustainable development for the coal enterprises.

若有所幫助,請採納,若需完善,請hi我.

C. 采礦專業英語翻譯(在線等,急)

The design for the underground mining design, design task is to flag the sheep-city tower Bao coal mine, the mine located in the Ordos City, Inner Mongolia Autonomous Region Zhungeer flag, administrative division under the flag of the sheep Zhungeer the town of Tower City.
Mine with an annual output of 450,000 tons proction scale exploitation of length of service was 36.9 years, designed with Adit pioneering system, multi-level mining, tape machine transport as the main mode of transport, mining methods adopted by the long arm of a single integrated mechanized mining methods, out - Ventilation and the ventilation fan combination of ventilation systems, multi-stage pump water drainage system Yang, design completed a total of eight drawings, design specification 79.
Key words; development, mining methods, the ventilation system

D. 采礦用英語怎麼說

您好!
很高興為你翻譯、解釋。您提出的采礦用英語怎麼說?

只有專業說內法:mining(漢字注音:埋嶺)容最准確。(漢語含義:n.采礦, 礦業)可做動名詞。
英語的其他表達方式均不能准確地表達「采礦」的動名詞。

例如:mine pron.我的;n.礦, 礦山, 礦井, 源泉, 寶庫, 地雷, 水雷;vt.挖掘, 開采, 在...布雷, 破壞
vi.開礦, 埋設地雷等,只適合做「開礦」的動詞

希望我的翻譯、解釋對你有幫助,祝你心想事成!

E. 采礦專業英語翻譯

Abstract: Sham Tseng goaf water may accumulate and be difficult to detect in time is the exploitation of the process led to the flooding problems. In this paper, micro-rock mining in the breakdown of elastic waves generated by the information source, application of rock mass elastic wave and the related breakdown of the theory and technology, to explore unknown goaf water accumulation and nucleation process, found the exact elastic wave velocity than the VP / VS, the amplitude ratio VSH / VPH, spectral, waveform, and frequency of abnormal microseism. Application of this proposed microseism ground telemetry, on-line monitoring and prediction of mine water hazards unknown technical ideas.

Keywords: coal; process water; microseism technology; forecast warning

F. 采礦專業英文翻譯

The Ge Ting coal mine is that Zi Bo City Bureau of Mines develops the third pair of the northwest part modernizing a shaft , being located in Shandong Province Ji Ning City building in helping north mining area. The shaft year designs 600,000 tons of efficiency , design the length of service 51. The shaft may cut coal being 3 coal , 16 coal , 17 coal tier mainly , the host mines 3 coal seams. The village , highway pressure coal are grave and , 3 coal seam length of service shortens since shaft geology condition is complicated,be prolong the shaft length of service, decide to exploit 16 , 17 coal, coal matches spirit with 3. And design that condition considers the queen synthetically , put forward opens up a scheme by the geology general situation , well-field range , reserves and 16 , 17 coal seam geology to well-field originally , push and big alleys by the fact that the economy technology ascertains the tie making use of 130 orbits to go up the hill preparing adhesive tape going up the hill comparatively going up the hill exploiting, the mining area being in progress to 1160 mining area designs that. By the analysis to 1160 mining area geology condition, the for sure adopt long unitary make for wall coal mining law , single wing exploits, coal mining handicraft has adopt top grade Pucai , has adopt all caving law to manage a roof, driving face adopt a cannon dig. And carry out equipment choosing a type , arrange turn out system after ascertaining the mining area parameter, work out safe technology measure. Keywords: Well-field opens up , mining area , make for increase wall coal mining law , top grade Pucai

G. 采礦專業英語翻譯 急需

其中最關鍵的步驟以任何極限平衡分析測定或估算抗剪強度參數(c、φ)的表面及預期滑動。在這個斜坡上壽茅坪道路,沒有抗剪強度是可用的信息的時候,所以估計,初步研究了由出版信息的基礎上對類似的岩石。
該書收獲(1974年)出版,情節、復制圖7.8,粘性的優點和摩擦角的岩石和土壤,基於估計結果的公布的抗剪強度反演斜坡破壞。這個故事是在一個橢圓區
涵蓋范圍估計為單節理的剪切強度unweathered花崗石。在選擇這一范圍認為摩擦角φ大概的范圍很廣,從30°平面表面非常光滑,45度粗糙或半硬質合金錶面。
更多的粘結強度是很難估計,0.05
被選中的0.2兆帕的結果為依據,對邊坡back-analyses繪制如圖7.8級
圖7.8:摩擦角之間的關系、粘聚力斜坡破壞動員各種材料。在繪制分被出版信息的反饋分析邊坡的失敗。1974年,跟收獲後)。
有些讀者可能會很驚訝這一粘結強度已假定為關節表面,明顯地沒有拉伸強度或' ',就會發現粘性土中。事實上,這種假設粘結強度是被截獲、剪切力軸,一個切線方向的曲線莫爾信封。這是由於曲率的匹配的齒形相連的關節面
增加的剪切強度由該聯鎖起著至關重要的作用,在100米第七章:一個邊坡穩定問題在香港的穩定邊坡的。例如,在考慮在這一章。一個充分的討論的剪切強度的岩層面在第4章。

H. 采礦工程專業英語翻譯

對於繼續采礦來說,一次性打入兩處是有效率的。通常在采礦中,每個機器打版入至權少一次需要5次操作。最理想最高效的是將打入總次數控制在7-10次。因為在確保安全的前提下,不考慮產品,16處平行打入,能夠提供足夠的通風以及搬運容量。因此最少5個主要入口常應用於將開放式礦井開采為裸礦,如數據8.2所示,

I. 有關礦產類的英語 單詞 有誰整理的共享一下 急用 謝謝!

礦產mineral
金礦gold
銀礦silver
銅礦coop
錫礦stannary['stænəri]
鐵礦iron
煤礦coal mine
以上是一些常用的礦產
接下來是一些與開采礦有回關的單詞
礦車,礦層(答ore car/ore car)
礦工-miner
采礦和冶金業-mining and metallurgy
礦山-mine
差不多就是這些,太難的也用不到

熱點內容
年級下冊英語第六單元試題 發布:2021-03-15 14:24:47 瀏覽:649
初中英語教研活動簡報 發布:2021-03-15 14:24:24 瀏覽:505
英語培訓機構簡歷模版 發布:2021-03-15 14:24:04 瀏覽:793
重慶大學虎溪校區英語角 發布:2021-03-15 14:23:12 瀏覽:768
孩子要不要上英語培訓班 發布:2021-03-15 14:23:05 瀏覽:960
如何提高高考英語聽力 發布:2021-03-15 14:22:34 瀏覽:590
英語思維導圖四年級下三單元 發布:2021-03-15 14:22:27 瀏覽:205
沂水英語培訓 發布:2021-03-15 14:21:43 瀏覽:242
2018中職英語試卷答案 發布:2021-03-15 14:21:36 瀏覽:918
15高考英語全國2 發布:2021-03-15 14:21:10 瀏覽:83